Problem
Shore Hire was contacted by Chroni’s Building & Design, a luxury building company that serves the South Coast of NSW. They needed a retaining wall solution for their site while they were doing early works for a large residential property in Hyams Beach.
Due to the site being sloped, its proximity to the coast, and the fact the ground was volatile, unstable sand, a retaining wall needed to be installed to make the site safe and stop the risk of a land slide.
Solution
To solve the customer’s problem, we originally looked at using water-filled barriers and fence panels, but our engineers deemed this solution unsuitable due to the difficult ground conditions.
Instead, we engineered a solution that utilised a King Post methodology, a highly useful system in a variety of excavation and retention applications. The design is essentially a temporary retaining wall and is incredibly robust and high-capacity.
By adapting a traditional King Post approach using driven I-Beams with Steel Shoring Box Panels spanning across them and Handrails attached to the top of the panels for edge protection, we were able to design a fully safe, engineered solution.
In summary, our King Post System provided a safe and secure environment for workers and the general public, ensuring that Chroni’s Building & Design could carry out their work while minimising potential risks on site.
If you would like to view our previous case studies, click here, or to learn how we can support your next project, request a quote today.