Shore Hre

¿No encuentra lo que busca? Llame al 1300 746 734 para obtener ayuda experta

Home Products Shoring King Post System

Sistema King Post

Sistema King Post

Descripción 1DC84AF1-36F8-424F-A2E3-2C7AE1790A18

Shore Hire’s King Post System is a highly useful system in a variety of excavation and retention applications. Designed to be a temporary retaining wall, the system is achieved by driving our steel shoring panels or steel plates into the ground and connecting them via steel I-beam posts.

Simple and versatile, the panels are made from high-strength steel, meaning that they are incredibly strong, long-lasting, and durable.

The installation process of the King Post System is quick, easy, and adaptable. Not only does it offer a vibration-free experience, significantly reducing the risk of on-site accidents, but it also facilitates seamless on-the-spot adjustments, minimising disruptions and delays.

Shore Hire’s King Post System is suitable for the majority of retention applications, including embankment and slope retention, flood defence walls, single-sided retaining walls, and basement excavations where it is not possible to drive sheet piles or when the working area must be clear.

Características 1DC84AF1-36F8-424F-A2E3-2C7AE1790A18
  • Versatile with various sizes of beams and panels, so whatever the job requires, Shore Hire has the option to suit
  • The panels are made from high-strength steel for the most robust and safest system possible
  • Dispone de una amplia gama de asistencia técnica, para que sepa que lo que está colocando en el suelo es el mejor producto y el más seguro posible.
  • Fabricado y certificado AS 4744.1-2000 para que sepa que se han marcado todas las casillas de seguridad cuando utilice nuestros productos.
  • An engineered system suited to meet a range of customer requirements
Adecuado para 1DC84AF1-36F8-424F-A2E3-2C7AE1790A18

Shore Hire’s King Post System is suitable for the majority of retention applications, including embankment and slope retention, flood defence walls, single-sided retaining walls, and basement excavations where it is not possible to drive sheet piles or when the working area must be clear.

Si necesita asesoramiento, siempre le recomendamos que hable con nuestro equipo técnico de ventas antes de cualquier alquiler.

Descargar formulario de datos técnicos

"*" indica campos obligatorios

Oculto

Descargar formulario

"*" indica campos obligatorios

Oculto

Get a quick quote on "King Post System" now

"*" indica campos obligatorios

Oculto
Oculto

Déjelo en manos de los expertos en obras temporales

Experiencia (inversa)
Solicite hoy mismo la visita de un representante técnico

Realizar una consulta Descargar solicitud de crédito

 

Proudly a UNITED RENTALS® Company
Visit UNITED RENTALS® Affiliated Companies below

People_of_shore_hire_web 2022-10-04 en 1.49.17 pm